Min. Order: | 1000 Piece/Pieces |
---|---|
Trade Term: | FOB,CFR,CIF,DDP,DAP,EXW |
Payment Terms: | L/C, D/P, D/A, T/T, WU |
Place of Origin: | Zhejiang, China (Mainland) |
Means of Transport: | Ocean, Air, Land |
Production Capacity: | 300000pcs per month |
Packing: | Polybag, Inner Box,... | Delivery Date: | Shipped in 30 days... |
---|---|---|---|
Power: | Manual | Standard or Nonstandard: | Standard |
Pressure: | Medium Pressure | Structure: | Stop |
Material: | Casting | Temperature of Media: | Medium Temperature |
Media: | Water | Brand Name: | JUNYUAN |
SIZE: | 1/2"-2" | COLOR: | BRASS OR PLATED |
MATERIAL: | BRASS OR BRONZE | CERTIFICATE: | ISO9001,UL.CSA,UPC.BS5154, |
Connection:: | MALE AND FEMALE | Technical:: | FORGED OR CASTING |
Working Temperature: | -10℃ to +120℃(from 14°F to 248°F) | HS Code: | 8481804090 |
FUNCTION: | Suitable for hot and cold water,compressed air,oils, non-corrosive fluids and steam. | HANDLE: | BRASS ,STELL , CAST IRON,AL. |
Forged Brass Stop Valve Top brass stop valve, Shut-Off Valves
Product Description
1. Certificate:
2.Material:
Part | Material | ||||||
Body | Brass: | Hpb 57-3 | Hpb 59-1 | CW617N | CW614N | DZR | lead free brass |
Handle | Brass | Zinc | Plastic | ||||
Ball | Brass with chrome plated | Iron with chrome plated | |||||
Sealing | NBR | ||||||
Handle | Brass | Plastic | Zinc | With chrome coated |
3.Technics:
Temperature: -20°C≤T≤150°C | ||||||
Pressure: P≤3.0MPa=30bar=435psi | ||||||
Medium: Water,Oil,Gas,etc. | ||||||
Thread: M×M threaded,BSP,NPT,UNION,ect. | ||||||
Surface treatment: Polished and chrome plated,nickle plated |
Packaging & Shipping
Production Process
Top quality and fast delivery require high automation equipment.Our production machine includes the following:
1.production equipment: forging, machining, polishing, plating and PVD
2.inspection equipment: spectrograph, chemical plating layer test, salt spray test, air and water pressure test, projection and various meters and gauges
Our Main Market: North and South America
FAQ
1.What is your MOQ ?
Usually our MOQ is2,000pcs. But we accept lower quantity for your tria order. Please feel free to tell us how many pieces you need, we will calculate the cost correspondingly, hoping you can place large orders after checking quality of our products and know our service.
2.How long is the sample lead time?
For existing samples, it takes 2-3 days. They are free. If you want your own designs, it takes 7-10 days, subject to your designs whether they need new MOLD, etc. Anyway, we will response fast to yourequest
3.How long is the production lead time
It takes 30 days for MOQ. We have large production capacity, which can ensure fast delivery time even for bulk
4.What format of the file do you need if I want my own design?
We have our own designer in house . So you can provide JPG, AI,cdr or PDF, etc.We will make drawing for mold or printing screen for your final confirmation based on technique.
5.What is your payment term?
Our payment term is TT 30% deposite after order signed and 70% against copy of T/T.paypel,western &union .